Nambiar Beverly Green Updates


Construction update log at Nambiar Beverly Green

Nothing dated can honestly be recorded yet, which is why the update log for Nambiar Beverly Green carries no dated entries. The project is pre-launch: construction has not begun, no launch or completion date has been announced, and K-RERA registration has been applied for; approval is expected by 20 August 2026. Design and documentation are what exist, a master plan drawn across 76 acres, a Phase 1 layout defining 298 villa plots on 36 acres, the villa floor plans, and an indicative price. This page sets out that position, explains what will be posted here and when, and commits to the source each future entry will come from. The wider project stage is on the construction status page.

Of every page on a project website, this is the easiest to fill with invented progress. Dates against a milestone log imply a schedule nobody has published, which would be indistinguishable from fiction. What follows instead is what is on record, what is not, and what has to happen before this page has anything to log.

The Current Stage

Item Where it stands
Master planDrawn across 76 acres for the full development
Phase 1 layoutDefined, 36 acres carrying 298 villa plots
Villa floor plansReleased, G+2, two principal footprints, east and west facing
PricingReleased as indicative only, and subject to change
K-RERA registrationAwaited, not issued
LaunchNot announced
Work on siteNone reported to us
Completion and handoverNot announced

What Has Actually Been Released

The master plan. Across the whole 76 acres it sets the project's shape: six landscaped parks along the southern edge, 12 m and 12.19 m internal roads with 9.14 m secondary roads, an entrance plaza carrying a dedicated bus bay, a retail and commercial block at the gate, and a 220 kV HT line realigned along the southern boundary.

Nambiar Beverly Green master plan — 76-acre development with Phase 1 of 298 villa plots across 36 acres

The Phase 1 layout. 36 acres holding 298 villa plots: 135 plots at 35 × 55, 59 at 40 × 63, 30 at 36'9" × 55, 10 at 41'10" × 63 and 64 odd plots, each size split between east and west facing. The setbacks come from the Karnataka Gazette Part-IVA, Table 8 schedule for plots of 150–250 sq.m, 1.0 m front, 0.8 m rear, 0.8 m at the sides.

The villa floor plans. Every villa is G+2 with a private lift serving all three levels. Ground level takes living, dining, kitchen and one bedroom; the first holds three bedrooms around a double-height void; and the second floor goes to terrace, a multipurpose room, a celebration terrace, a wellness terrace, a yoga deck, a dance deck, a barbeque zone and a utility terrace. Completing the plan are covered parking for two cars, a driver's toilet, a domestic-help room with bath and a utility. On a 35 × 55 plot of 1,925 sq.ft. the villa runs 3,732 to 3,782 sq.ft; on a 40 × 63 plot of 2,520 sq.ft. it runs 4,627 to 4,638 sq.ft. The drawings are on the villas page.

Indicative pricing. The quote runs from ₹5.48 Cr, struck at ₹13,499 per sq.ft. of saleable area with the development and infrastructure charge and 5% GST included, and registration, stamp duty and maintenance excluded. A preferential-location charge attaches to east-facing and corner plots. Until it is registered, every figure is indicative and subject to change; the basis for it is set out on the price page.

Dates and Timelines

Publish a date only when a document stands behind it. On this project, nothing does yet:

  • No registration, so no registered timeline. A completion date becomes a commitment when it is recorded in the K-RERA registration, where missing it carries statutory consequences for the promoter. There is no registration here, so there is no such date to report.
  • No launch announcement. The developer has not announced a launch, and none is inferred here from activity, from a price sheet or from anything said in conversation.
  • No work to date-stamp. No clearing, levelling, roads, drainage or utilities have been reported to us, so there is no event whose date could honestly be recorded.
  • No approval references. No sanctioned-plan or clearance reference is on record, so no approval can be confirmed as in place, and none can be dated.

The log is empty because the project is pre-launch and no construction has begun. Should you come across a dated milestone list for this project anywhere, ask which document each date came from, then check each date against the K-RERA portal.

What Will Be Posted Here, and When

The order below is the order the project will reach them in. Every entry will carry the date it was posted here, and every entry will name the document it came from:

  1. K-RERA registration granted. The first real entry. The registration number will be published, the portal listing linked, and the indicative areas, charges and dates replaced across this website with the registered ones.
  2. Launch and inventory released. The launch name as registered, the inventory released for sale, and the price list as filed, not as quoted.
  3. First quarterly progress filing. Once registered, the promoter updates the project's page on the authority's website every quarter. From that point this log follows the filings.
  4. Site works. Clearing, levelling, internal roads, drainage, water and electrical infrastructure, then villa construction, each recorded as the filings record it, in the promoter's own terms, without embellishment.
  5. Approvals and clearances. Recorded when a reference number exists that you can check, and not before.
  6. Photography. Site photographs only after registration, and only when there is genuine work to show.

Where Each Future Update Will Come From

After registration, this page takes the promoter's quarterly filings to K-RERA as its primary source, in preference to anything the sales channel tells us. Section 11 of the Real Estate (Regulation and Development) Act, 2016 requires the promoter to maintain the project's page on the authority's website and to update it every quarter. What such a filing ordinarily carries is the units booked and the inventory remaining, physical progress against the registered scope with a stated percentage of completion, progress on internal roads and services, the status of approvals still outstanding, current photographs of the work, and any revision to the completion date together with the reason for it.

The approach here is narrow and specific: every progress entry posted after registration will be sourced from the K-RERA filings and linked to them, so you can read the original rather than a paraphrase. Anything posted that does not come from a filing, a developer announcement for instance, will be labelled as such. And a gap in the filings will be reported as a gap; the authority publishes defaulters for non-filing, and a promoter who stops filing is telling you something.

How to read those filings step by step, and how to check any Karnataka project for yourself, is set out on how to verify a Karnataka RERA registration.

Site Photographs

Two reasons account for the absence of a site photograph. The first is that there is no construction to photograph, a picture of undeveloped land tells you nothing reliable about what will be built on it. The second is that a project which is not registered should not be marketed with site imagery at all. This page therefore carries master-plan artwork only, and will carry photographs once the project is registered and there is work to show. The renders and drawings released so far are collected in the gallery.

What to Do Between Updates

  • Check the portal yourself. Search the project name and the promoter name Nambiar Builders at rera.karnataka.gov.in. If nothing is returned, the registration has not yet been granted, an application in process does not appear on the registered-projects list. A check once a quarter is a sensible rhythm.
  • Register your interest if the project suits you. Expressions of interest are being taken now, from ₹5 lakh. An expression of interest records that you want the registration number and the launch particulars when they are published. It is not an allotment and it reserves no villa, and it is fully refundable if you choose not to proceed at any point before you sign a formal agreement.
  • Keep what you are given. Ask for the Phase 1 layout, the villa plans, the areas and the rate in writing and dated, so you can compare them with the registered documents later.
  • Do not commit money before registration. Under the Act a project may not be advertised, marketed or sold until it is registered, and money paid before registration has none of the statutory protections around it.

Frequently Asked Questions about Project Updates

1. Why does this update log have no entries?

Nothing has yet happened that can honestly be dated. The project is pre-launch, construction has not begun, no launch or completion date has been announced, and K-RERA registration has been applied for with approval expected by 20 August 2026.

2. When will the first real entry appear?

On the grant of K-RERA registration. It is the first event with a document standing behind it, and the entry that lets everything else on this website be replaced with registered figures. When that will happen cannot be known in advance.

3. Where will the progress information come from once construction starts?

From the promoter's quarterly filings to K-RERA, which are public. Rather than paraphrase them we will link each one, so you can read the original. Anything appearing here that is not from a filing will be labelled as a developer announcement.

4. Has anything at all been released so far?

Yes, though all of it is design and documentation rather than construction: the 76-acre master plan, the Phase 1 layout of 298 villa plots across 36 acres, the G+2 villa floor plans, and an indicative rate. No authority has certified any of it.

5. Another website shows a possession year for this project. Which is right?

Put the question back: which document did it come from? No completion or possession date has been announced, and a date becomes a commitment only when it appears on the K-RERA registration. Any year quoted today is somebody's estimate rather than a disclosure.

6. How will I be told when this page changes?

Register an expression of interest through the contact page and we will tell you when the registration is granted. The change will show on the K-RERA portal first and independently of us, so a quarterly check of your own is worth it.