Nambiar Beverly Green logo
  • Home
  • Location
  • Connectivity
  • Contact
  1. Home
  2. Location
  3. Connectivity

Nambiar Beverly Green Connectivity

Nambiar Beverly Green enjoys good road connectivity across south Bangalore. The project is right on Bannerghatta Road (State Highway 87), which runs north into the city and south toward the national park. The NICE Road is just 4.6 km away at the Bannerghatta toll plaza, giving a fast route around the south and west of the city, and the Outer Ring Road connects at Jayadeva Hospital. Electronic City is just 15 km away, about a 30-minute drive, and Kempegowda International Airport is 68 km, roughly two hours. The metro is expanding this way too: the nearest operational station is 12.5 km on the Green Line, and the Pink Line's Kalena Agrahara station is only 6.3 km away, opening soon.


Road connectivity at Nambiar Beverly Green

Bannerghatta Road (State Highway 87) is the main road serving Nambiar Beverly Green connectivity, running north towards the city and south towards the national park. It is not the only way out: the NICE peripheral at Gottigere links across to Kanakapura Road and the wider ring, and the Outer Ring Road, the metro under construction and the airport are all reached from this corridor. The address is Bilwaradahalli, Bangalore 560083, at 12.823744° N, 77.571837° E.

The measured distances from the address:

  • Bannerghatta Nature Camp: 3 km.
  • Electronic City: 15 km, set out in the commute section below.
  • Kempegowda International Airport: 68 km.
  • Metro: 12.5 km to the two operational Green Line stations, and 6.3 km to Kalena Agrahara on the Pink Line, which is not yet open.
  • Nearest bus stop: 190 m from the main gate, though it runs only about fourteen buses a day.
  • Full sets: ten schools on the schools page, eight hospitals on the hospitals page, and six malls and six tech parks on the location overview.

Road Connectivity

The highway is 45 km long from end to end. State Highway 87 leaves Hosur Road at Adugodi, takes the Bannerghatta name southward through Jayanagar, Bilekahalli, Hulimavu and Gottigere, runs past Bannerghatta National Park, and then continues as the Jigani–Anekal and Anekal–Hosur roads until it finishes at Samanduru close to the Tamil Nadu border. Seen from an address on its southern reach, three junctions on it carry all the work.

  • NICE Road, near Gottigere, the crossing that matters most here. North of the site on the same road.
  • Outer Ring Road, at Jayadeva Hospital, where SH-87 meets the city's ring, and the route onto its southern and eastern arc. North of the site on the same road.
  • Hosur Road, at Adugodi, the top of the corridor, where Bannerghatta Road ends and central Bangalore begins.

Past Bannerghatta, to the south and east, the same highway carries on into the Jigani industrial belt and then to Anekal. None of those destinations is given a kilometre figure or a drive time here, because none has been measured; put the coordinates above into Google Maps and work them out for yourself, remembering that on this corridor the hour of day changes the answer substantially.

The NICE Road Link

Built under the Bangalore–Mysore Infrastructure Corridor project, the NICE Road is a tolled peripheral route. It loops around the south and west of the city and ties together Hosur Road, Bannerghatta Road, Kanakapura Road, Mysore Road and Tumkur Road without dragging traffic through the built-up centre. Where it crosses Bannerghatta Road near Gottigere is the practical asset for this end of the corridor: eastbound it opens Electronic City, Bommasandra and Hosur Road; westbound and northbound it runs towards Mysore Road and Tumkur Road, which is also one of the two usual approaches to the airport. For a household with work in the Electronic City direction, that junction is the most important piece of infrastructure near this address, today, more important than the metro.

Tech Parks and the Daily Commute

Six tech parks are listed below, nearest first, with distances and typical drive times from the project. Ahead of all of them, Electronic City is 15 km away, about 30 minutes by car or bike. It is the destination that weighs most heavily in a commute decision at this end of the corridor, and the one the NICE Road crossing at Gottigere exists to serve. Travel times are typical and vary with traffic and time of day.

DestinationDistance from the siteTypical time by carTypical time by bike
Electronic City15 km30 min30 min
Tech parkDistance from the siteTypical time by carTypical time by bike
Primeco Towers10.6 km29 min36 min
Kalyani Magnum Tech Park11.7 km45 min41 min
IBC Knowledge Park13.9 km52 min47 min
Velankani Tech Park14.8 km33 min32 min
AMR Tech Park15.1 km46 min46 min
AKR Tech Park18.9 km46 min44 min

Photographs of those same six parks follow, in the order of the table, nearest first. Under each one is that park's measured distance and its measured typical time by car, carried straight down from the table above.

Primeco Towers, Bangalore, two blue-glass office blocks linked above a stone-clad landscaped podium
Kalyani Magnum Tech Park, Bangalore, curved glass office building with lit floors at dusk and a canopied block alongside
IBC Knowledge Park, Bangalore, glass and steel office towers seen from the street, with the gated entrance and pedestrians in front
Velankani Tech Park, Bangalore, blue-glass office tower with projecting balcony bays at each end of the elevation
AMR Tech Park, Bangalore, glass-fronted office building with tenant signage across the upper floors and palms along the road frontage
AKR Tech Park, Bangalore, office blocks either side of the internal access road, with parked cars and the gate in the foreground

Weigh the Time, Not the Kilometres

Distance and travel time do not track each other here. What decides a journey is the kind of road it uses, not its length: a run that stays on a fast arterial beats one that ends in dense city streets, whatever the odometer reads.

  • Velankani Tech Park: 14.8 km, 33 minutes by car.
  • Kalyani Magnum Tech Park: 11.7 km, 45 minutes, nearer yet twelve minutes further in time.
  • IBC Knowledge Park: 13.9 km, 52 minutes, the slowest of the six.
  • AKR Tech Park: 18.9 km, 46 minutes.
  • The hospital figures behave the same way: Manipal Jayanagar 13.4 km, 49 minutes; Narayana Institute of Cardiac Sciences 18.6 km, 42 minutes.

If two employers are in play, compare the minutes rather than the kilometres.

Across the table the bike is the same speed or faster, with one exception. Primeco Towers is the one entry where the bike is slower than the car, 36 minutes against 29, and the figures are published as supplied rather than tidied up. Electronic City is the exception that proves the point of this section: at 15 km it is further out than four of the six tech parks, yet at 30 minutes by car and 30 minutes by bike it beats every one of them, because the NICE Road from Gottigere is a fast run and not a city crawl. As for the wider employment areas this end of the corridor serves, Bommasandra and the Jigani belt have no measured distance from this site, so nothing is printed for them; both are reached east through the same crossing, and the sensible thing is to measure them yourself from 12.823744, 77.571837 at the hour you would really travel.

Metro Connectivity

Namma Metro Pink Line along Bannerghatta Road with its southern terminus at Kalena Agrahara

The nearest metro station a resident here can actually use today is 12.5 km away. That figure covers two stations at the southern end of Namma Metro's operational Green Line, Yelachenahalli and Silk Institute, each 12.5 km from this address and both in service. Kalena Agrahara, the Pink Line's southern terminus, is closer at 6.3 km, but it is not open, and no section of the Pink Line is carrying passengers yet. While that remains true, plan a commute around the 12.5 km Green Line figure and treat the 6.3 km as a prospect rather than an amenity.

Metro Stations and Distances

StationLineDistance from the siteStatus
YelachenahalliGreen Line12.5 kmOperational today
Silk InstituteGreen Line12.5 kmOperational today
Kalena AgraharaPink Line6.3 kmNot open, expected September 2026

The Pink Line Along Bannerghatta Road

Namma Metro's Pink Line is aligned along Bannerghatta Road, running north from Kalena Agrahara, the station formerly named Gottigere, to Nagawara. It measures about 21.25 km and carries 18 stations, twelve of them underground and six elevated. Those six elevated stations stand on Bannerghatta Road itself, and they are the ones that matter to this corridor:

  • Kalena Agrahara, the southern terminus, and the station nearest this end of the road at 6.3 km, though it is not open yet. Formerly named Gottigere, after the postal head office for this pincode. Being a terminus rather than a mid-line stop, its status is given as final stages before operations, and a passenger boarding here would join a train at the start of its run.
  • Hulimavu
  • IIMB
  • Jayaprakash Nagar 4th Phase
  • Jayadeva Hospital, at the Outer Ring Road junction, and an interchange with the Yellow Line.
  • Tavarekere

When the Pink Line May Start Running

A deadline set by the Greater Bengaluru Development Minister put the 7.5 km elevated stretch from Kalena Agrahara to Tavarekere into service on 15 August 2026. That date will not be met. Deccan Herald reported in July 2026 that it would be missed and that the opening is now expected in late August or early September, with signalling validation still outstanding before the statutory safety inspection, the CMRS (Commissioner of Metro Rail Safety) clearance, can be held. Again was the word in the headline, and the record behind it is documented: December 2025 was the earlier planned date and passed; 15 August 2026 was put in its place and is now reported as going the same way; late August or early September is where the expectation stands. Three targets, two missed. Read the new window as an expectation rather than a commitment, and check the current position directly with BMRCL before allowing the metro any weight in a purchase decision. The remaining 13.76 km underground section runs Tavarekere to Nagawara, Dairy Circle is a station along that section, not its southern end. For the full corridor the minister's stated deadline is March 2027, given in June 2026 and reported by The Hindu on 19 June and by The New Indian Express, under a headline about deadlines being pushed again.

There is a reason every date on this page carries an attribution: on this line, dates move. Of the three elevated targets, two have already gone by, and the March 2027 figure comes from the same office that set them. Rather than trust any secondary page, this one included, check the position as it stands with BMRCL.

When the elevated stretch does start running, the trip from Bannerghatta Road into the city centre is expected to be about 25 minutes. That is a projection for a line that has never carried a passenger, not a measured figure, and not something that belongs in the same column as the school distances published elsewhere on this site. Take it as an indication of what the line is designed to do, and check it again once the service is actually open.

Bus Connectivity

BMTC bus services along Bannerghatta Road near Nambiar Beverly Green

BMTC runs the length of Bannerghatta Road, from the city centre out to Bannerghatta. Because the road is the only spine here, it is also the bus route for every settlement along it, Hulimavu, Gottigere, Kalena Agrahara, Bilwaradahalli, Bannerghatta. Three BMTC stops serve this address, and all three now carry a measured distance: 190 m, 1.5 km and 2.3 km. What matters more than the distances is how differently the three are served, so the table gives frequency alongside the kilometres.

The Three Stops and What They Run

BMTC stopDistance from the siteHow well it is servedRoutes and where they go
Bilavaradahalli Cross190 m from the main gateLimited, about fourteen departures a day371-A, 371-C, 371-D to KR Market and Kempegowda Bus Station; 398-B to Chandapura and Kaggalipura; 211-NB to Bannerughatta Circle
Bilavaradahalli1.5 kmFrequent, direct to Majestic365-D, 365-DB, 365-E to Kempegowda Bus Station; 366-C, 366-G, 366-M to KR Market; 215-Z
Bannerughatta Circle2.3 kmThe busiest of the three365-P to Anekal; 365-J to Jigani APC Circle; 366-E, 366-Q, 366-Z; 368; 370-A; and KIA-14A direct to the airport

Below, the complete day's timetable is printed for Bilavaradahalli Cross, and only for that stop, because it is the one where the whole service is held, every departure, first to last, and at fourteen a day the individual times are the fact a household actually needs. Bilavaradahalli and Bannerughatta Circle get routes, destinations and a description of frequency instead, with no times at all: the departure lists held for those two cover narrow windows rather than the whole day, and setting a partial list out as though it were a timetable would understate the service at exactly the two stops that are frequent.

The Nearest Stop Is Close, but Thinly Served

Bilavaradahalli Cross is 190 m from the main gate, two minutes on foot, and that figure would be easy to leave standing on its own. It should not stand on its own. The stop is served by about fourteen departures a day: roughly one bus an hour across a working day, and nothing like the turn-up-and-go service a stop that close implies. The routes themselves are useful ones, 371-A, 371-C and 371-D to KR Market and Kempegowda Bus Station, 398-B to Chandapura and Kaggalipura, 211-NB up to Bannerughatta Circle, but with fourteen departures you plan each journey around a particular bus instead of walking out and catching one.

If anyone in the household will depend on a bus daily, plan around the other two stops. The busiest of the three is Bannerughatta Circle, 2.3 km away, which adds the 365-P to Anekal, the 365-J to Jigani APC Circle, the 366-E, 366-Q and 366-Z, the 368 and the 370-A. Closer in, Bilavaradahalli, 1.5 km away, is frequent, with the 365-D, 365-DB and 365-E direct to Majestic, the 366-C, 366-G and 366-M to KR Market, and the 215-Z. Getting to either means a short drive, an auto ride or a feeder hop on the 211-NB from the stop at the gate; walking is not realistic. That is the honest shape of bus access here: the closest stop is merely the closest, and it is the second and third that will actually carry a commuter.

Bilavaradahalli Cross: the Full Day's Service

Three things in this table matter more than the individual rows.

  • First bus 5:51 AM, last bus 7:04 PM. There is no evening or night service from this stop. Anyone working late has no bus home to a stop 190 m from the gate, and that is the single most important thing to know about it.
  • The middle of the day is thin. There is a gap of more than two hours between the 9:59 AM and the 12:14 PM, and another between the 12:14 PM and the 1:34 PM.
  • Fourteen departures across roughly thirteen hours, unevenly spread, clustered in the early morning and the evening peak, sparse between.
DepartureRouteTowards
5:51 AM371-CKR Market (Kalasipalya)
6:00 AM371-AKR Market (Kalasipalya)
7:15 AM371-DKempegowda Bus Station
9:06 AM371-CKR Market (Kalasipalya)
9:20 AM398-BChandapura
9:59 AM211-NBBannerughatta Circle
12:14 PM211-NBBannerughatta Circle
1:34 PM211-NBBannerughatta Circle
3:00 PM398-BChandapura
3:54 PM211-NBBannerughatta Circle
5:09 PM211-NBBannerughatta Circle
5:26 PM371-CKR Market (Kalasipalya)
6:05 PM398-BChandapura
7:04 PM211-NBBannerughatta Circle

Timings are as shown on Google Maps in July 2026. BMTC alters its schedules from time to time, check the live departure board at mybmtc.karnataka.gov.in before travelling.

Set that against the 190 m: a two-minute walk, at the end of which is a thinly served fourteen buses a day, the first at 5:51 in the morning and the last at 7:04 in the evening. For a school run or a mid-morning errand it works. For a commute that finishes after seven, or for coming back from the city at night, it does not, and the 1.5 km and 2.3 km stops are where to look instead.

The Airport Bus from Bannerughatta Circle

KIA-14A runs from Bannerughatta Circle direct to Kempegowda International Airport. It is worth pointing out on its own, because the airport is the longest journey anyone at this address makes regularly, 68 km, 2 hours by car, and a direct service from a stop 2.3 km away removes the two things that make the drive expensive: the parking and the return leg. In a list of route numbers at a busy stop it is easy to miss, which is exactly why it is called out separately here.

Getting Here from Majestic

In the reverse direction, from Kempegowda Bus Station (Majestic), the run out to Bannerughatta Circle takes about 1 hour 13 minutes on the 365 or 365-P over 39 stops, and the run to Bilavaradahalli about 1 hour 7 minutes on the 365-D over 36 stops. These are city-bus journeys through south Bangalore traffic, so read them as typical rather than fixed, exactly as the car and bike times elsewhere on this page are typical.

A Note on the Spelling

In BMTC's own records the stops are Bilavaradahalli Cross, Bilavaradahalli and Bannerughatta Circle. This site, following the project's own postal address, writes the locality Bilwaradahalli and the corridor Bannerghatta Road. Only the spellings differ; the places do not. Search on either form and you are looking at the same village and the same road.

The Bus Bay Inside the Scheme

Inside the community, a dedicated bus bay at the entrance plaza is documented in the master plan, so school and staff transport pulls off Bannerghatta Road instead of halting on it.

Rail Connectivity

Rail access from Bannerghatta Road, there is no railway station on the corridor

On this corridor rail is the weak link, and saying so is more useful than dressing it up. There is no railway station on Bannerghatta Road. None of the four corridors of the Bengaluru Suburban Railway comes down it either; they serve the Devanahalli, Chikkabanavara, Whitefield and Hosur-side axes instead. Mainline departures are from KSR Bengaluru City and Bengaluru Cantonment in the centre of the city, and the nearest suburban halts lie off this corridor to the east, on the Bengaluru–Hosur line, reached via the NICE Road. Plan on driving, or, once it opens, on the metro from the northern stretch of Bannerghatta Road.

Air Connectivity

Route to Kempegowda International Airport from Bannerghatta Road

The longest journey a resident here will make regularly is to Kempegowda International Airport, which stands on the far northern edge of the metropolitan area, the opposite end of the city from this address. Two routes are in normal use: north up Bannerghatta Road and through the city to the Outer Ring Road at Hebbal, or west along the NICE Road from the Gottigere junction and round to Tumkur Road. Neither is short, and both swing heavily with the hour. The measured figure is 68 km, 2 hours by car and 1 hour 58 minutes by bike; those times are typical and vary with traffic and time of day, so add a generous buffer for an early flight.

Direction and Route by Landmark

Only the rows that can be sourced carry a distance in the table below, the Nature Camp, the three metro stations, Electronic City and the airport, and the rest carry a direction or a junction instead. The three BMTC bus stops are measured as well, but they appear in the bus section above rather than here. The measured tech-park and Electronic City distances and times are in the commute section further up; schools, hospitals and malls each have their own table on their own page.

DestinationWhich way from the siteDistance and status
Bannerghatta Nature Camp (Jungle Lodges & Resorts)South, on Bannerghatta Road3 km, measured
Bannerghatta Biological ParkSouth, on Bannerghatta RoadThe Nature Camp stands on the Biological Park campus
Gottigere and the NICE Road junctionNorth, on Bannerghatta RoadPostal head office for 560083; the NICE Road crosses here
Kalena Agrahara (Pink Line southern terminus)North, on Bannerghatta Road6.3 km, station not open; missed its 15 August deadline, now expected late August or early September
Yelachenahalli and Silk Institute (Green Line)North-west, off the corridor12.5 km each, the nearest operational metro today
Jayadeva Hospital and the Outer Ring RoadNorth, on Bannerghatta RoadSH-87 meets the ORR at this junction
Electronic City and BommasandraEastVia the NICE Road from Gottigere; Electronic City is 15 km, measured, 30 min by car and 30 by bike. No measured figure for Bommasandra
Jigani and AnekalEast and south-eastOn the SH-87 continuation past Bannerghatta
Adugodi and central BangaloreNorthWhere Bannerghatta Road meets Hosur Road
Kempegowda International AirportFar north68 km, measured, 2 h by car and 1 h 58 min by bike; the opposite end of the city. KIA-14A runs there direct from Bannerughatta Circle, 2.3 km away
Nearest railway stationOff the corridorNo station on Bannerghatta Road; mainline from KSR Bengaluru City and Cantonment

How to Judge This Connectivity

Honestly summarised, the address is well connected in one direction and ordinary in the others. Eastward, to Electronic City, Bommasandra and Hosur Road, the NICE Road crossing at Gottigere makes the journey genuinely straightforward. North into the city is a single arterial that congests, with a metro line being built down its upper half that will change that materially once it runs. West and the airport are long journeys. Rail does not serve this corridor at all. A household whose centre of gravity is the eastern industrial and IT belt, or the Bannerghatta Road office belt, will find the connectivity works today. A household oriented to Whitefield or the north of the city should be honest with itself about the daily drive before buying. Related pages: location overview, the Bilwaradahalli locality, schools and hospitals.

Frequently Asked Questions


1. How is Nambiar Beverly Green connected to the rest of Bangalore?

Through one road. Bannerghatta Road, State Highway 87, passes the site, running north into the city and south into the national park. Near Gottigere the NICE Road crosses it, the eastward route to Electronic City; the Outer Ring Road crosses at Jayadeva Hospital.

2. When is the Bannerghatta Road metro expected to start running?

The Kalena Agrahara to Tavarekere stretch was set to open on 15 August 2026; Deccan Herald reported in July 2026 that this deadline would be missed, with late August or early September now expected. No Pink Line section carries passengers today, confirm with BMRCL.

3. Which metro stations are on Bannerghatta Road, and how far are they?

Six, all elevated: Kalena Agrahara, the southern terminus, then Hulimavu, IIMB, Jayaprakash Nagar 4th Phase, Jayadeva Hospital and Tavarekere. Kalena Agrahara is 6.3 km north and not open yet; the nearest station running today is 12.5 km away, on the Green Line.

4. What does the NICE Road do for this address?

It is a tolled peripheral road linking Hosur Road, Bannerghatta Road, Kanakapura Road, Mysore Road and Tumkur Road. From the Gottigere crossing, eastbound traffic reaches Electronic City and Bommasandra without entering the city, the most useful infrastructure near the site.

5. Is there a railway station near the project?

No. The Bannerghatta Road corridor has no railway station, and no Bengaluru Suburban Railway corridor runs down it. Mainline departures are from KSR Bengaluru City and Bengaluru Cantonment in the centre, and the nearest suburban halts lie east of this corridor.

6. How far is the nearest bus stop, and how good is the service?

Bilavaradahalli Cross is 190 m from the main gate, but thinly served: about fourteen departures a day, with no evening or night service. Anyone relying on a bus daily should plan around Bilavaradahalli at 1.5 km or Bannerughatta Circle at 2.3 km, both frequent.

7. How far is Kempegowda International Airport?

It is 68 km away, 2 h by car and 1 h 58 min by bike. Allow a generous buffer at peak times: the airport occupies the far northern edge of the metropolitan area, the opposite end of the city from this address.

Explore Nambiar Beverly Green


Nambiar Beverly Green construction status
Nambiar Beverly Green villa investment potential on Bannerghatta Road
Nambiar Beverly Green K-RERA registration status

Nambiar Beverly Green brochure
Nambiar Beverly Green reviews
About Nambiar Builders, developer of Nambiar Beverly Green
Nambiar Beverly Green frequently asked questions
Nambiar Beverly Green guides and explainers

Disclaimer : The content is for information purposes only and does not constitute an offer to avail of any service. Prices mentioned are subject to change without notice and properties mentioned are subject to availability. Images for representation purposes only. This is the official website of authorized marketing partner. We may share data with RERA registered brokers/companies for further processing. We may also send updates to the mobile number/email id registered with us.

As an authorized marketing partner, we provide verified project updates and insights. By submitting your details, you express interest and consent to receive communication via call, SMS, or email. To provide seamless service, your information may be shared with our RERA-registered associates for expert assistance.

© 2026 All rights reserved

Privacy Policy, Disclaimer

Enquire Now
Title